Photo's from 2013.
Jan 2013, Modifying the rollers on the rail bender to bend my rail.
July 2013. Starting on the tracks.
Aug 2013, Picking out ballast, laying out where the railroad will go, making a switch and installing track.
Sept, 2013. Building a switch and switch stand & throw.
Oct, 2013. Finished up on the switch stand and a right hand switch. Installed the switch, made more track panels and the bridge.
Nov, 2013. Build a left hand switch and started to install the bridge.
Dec, 2013. Moved the sub-base and ballast piles and finished up installing the bridge before winter set in.